Customer: Letuswork GmbH
Project: Tunnel Frankenhain
Duration: from 05.01.2022 to 30.09.2022
Complete installation – binding of electrical panels, cables and all lighting fixtures in a tunnel, 899 meters long, located in the north-south direction. It consists of two tunnel tubes that move in one direction.